Kitset homes and cabins in NZ: which consent route a kitset takes

A kitset is a way of buying a building, not a separate category of one. Up to 30 m² without a bathroom, Schedule 1 exemption 43 lets an engineer-reviewed kitset go up without a building consent. A kitset dwelling up to 70 m² can use the granny flat exemption if an LBP is involved. Anything bigger is a normal building consent.

Last checked 15 September 2026 against Tiny Houses guidance, fifth edition, January 2026

Updated · About 6 minutes to read

No-consent kitset
≤ 30 m²
exemption 43, no bathroom
Kitset dwelling
≤ 70 m²
Schedule 1A, with an LBP
Above 70 m²
Consent
the standard pathway
Boundary
1 m
for exemption 43

Is a kitset home treated differently from any other building?

Mostly no. The Building Act cares about what the building is, how big it is and who designed and built it, not whether it arrived flat-packed. MBIE is blunt about the baseline: "All building work must comply with the Building Code, even if it does not require a building consent." Where kitsets do get special treatment is one exemption, number 43, for small kitset or prefabricated buildings whose design a chartered professional engineer has reviewed. What a "compliant" kitset should come with is in Building Code compliant tiny homes.

10, 30 or 70 m²: which rule are you under?

10 m²
Schedule 1, exemption 3

Up to 10 m²

No sanitary facilities, no potable water storage. Sleeping only if it is used with a dwelling and has no cooking facilities.

Read the rule
30 m²
Schedule 1, exemptions 3A, 3B and 43

Over 10, up to 30 m²

Lightweight construction, or LBP-built or supervised, or an engineer-reviewed kitset. Not within 1 m of a residential building or a legal boundary.

Read the rule
70 m²
Schedule 1A, granny flat

Up to 70 m²

A detached dwelling. Restricted building work designed and built or supervised by an LBP, and you notify the council before and after.

Read the rule

Areas drawn to scale against 70 m². These compare floor area only — a real 30 m² home is usually a long rectangle, not a square. Conditions from the MBIE Tiny Houses guidance, fifth edition, January 2026.

Which route does a kitset take at each size?

Kitset buildings by floor area and use
What you are buildingRouteWhat it needs
A kitset shed, studio or sleepout up to 10 m²Schedule 1, exemption 3Single storey, no sanitary facilities, no potable water storage; sleeping only if used with a dwelling and no cooking facilities
A kitset cabin or sleepout, 10–30 m²Schedule 1, exemption 43Supplier had the design carried out or reviewed by a chartered professional engineer; built to that design; smoke alarms if anyone sleeps in it; 1 m from any residential building or legal boundary; still no bathroom or potable water storage
A kitset granny flat with a kitchen and bathroom, up to 70 m²Schedule 1A, the granny flat exemptionA detached dwelling meeting the Building Code in full; restricted building work designed and built, or supervised, by an LBP; the council told before and after
A kitset house over 70 m²Building consentThe standard consent pathway, like any new house

Source: MBIE Tiny Houses guidance, fifth edition, January 2026, section 7.2. Full conditions on the 10 and 30 m² exemptions and the 70 m² granny flat exemption.

What does exemption 43 ask of the kitset supplier?

That the manufacturer or supplier, as section 14G of the Building Act defines them, has had the design carried out or reviewed by a chartered professional engineer, and that the building is actually put up in accordance with that design. That is the question to ask any kitset seller before you pay: has a chartered professional engineer designed or reviewed this kit, and can I have that in writing? If the answer is vague, the exemption is not something you can rely on.

Can a kitset cabin have a bathroom?

Not under the Schedule 1 exemptions. MBIE: "Detached buildings built in accordance with Schedule 1 of the Building Act cannot contain sanitary facilities or facilities for the storage of potable water." So a 30 m² kitset cabin with a toilet and shower is not exemption 43. It is either a granny flat under Schedule 1A, with an LBP and council notification, or a building consent.

What does a kitset usually leave out?

The price on a kitset is for the kit, and a kit is the part of the build that travels well. What it leaves to you is the part tied to your site: getting it there, the foundations or piles, connecting water, wastewater and power, and the licensed trades. Plumbing, drainlaying, gasfitting and electrical work have their own licensing and are not covered by any building exemption, and MBIE says connecting to on-site utility services needs a building consent.

  • Delivery to your site, and whether a truck can get it into position.
  • Foundations or piles, which are building work in their own right.
  • Services: water in, wastewater out, power, and who connects each.
  • Licensed trades: plumber, electrician and drainlayer, booked early. See building a tiny house yourself.
  • Finishing: linings, painting, decks and steps, often sold separately.
  • The district plan, which no building exemption touches. See resource consent.

How much do kitset homes cost in NZ?

Trade Me's own buyer article puts tiny home prices in New Zealand at "under $5,000 to over $260,000", and the bottom of that range is kitsets. Read every kitset price for what it includes, whether it includes GST and delivery, and what you will still have to pay for on site. The cost page has published from-prices from NZ builders for comparison.

Frequently asked questions

Do I need a building consent for a kitset home in NZ?

It depends on size and use. Up to 30 m² with no bathroom, an engineer-reviewed kitset can use Schedule 1 exemption 43. A kitset dwelling up to 70 m² can use the granny flat exemption with an LBP. Larger homes need a building consent.

Can I put up a kitset cabin myself?

Up to 10 m² under exemption 3, or 10 to 30 m² under exemption 43 if it is built to the engineer-reviewed design, yes. A kitset granny flat under Schedule 1A needs its restricted building work designed and built, or supervised, by an LBP.

Can I live in a 30 m² kitset cabin?

Not as a standalone home under the Schedule 1 exemptions: they allow no sanitary facilities or potable water storage, and sleeping only where the building is used with a dwelling and has no cooking facilities. A home you live in needs the granny flat exemption or a consent.

Does a kitset need resource consent?

Possibly. Building consent exemptions say nothing about your district plan, which decides what can go where. Check the zone rules for a second building or dwelling before you buy.

What should I ask a kitset supplier?

Whether a chartered professional engineer designed or reviewed the kit, in writing; what the price includes; whether GST and delivery are included; and what foundations and connections you will need on site.