Check your consent path
Costs

What a tiny home costs in New Zealand

Two NZ builders publish full price lists, and they start around $47,500 for a 6 m studio. But the home is not the project. Site preparation, a power connection, plumbing and council fees are all outside the quoted price, and one builder publishes ranges of $1,500–8,000, $1,500–4,000, $1,500–6,000 and $1,500–5,000 for them.

Last checked 15 September 2026 against Tiny home prices NZ

Updated · About 7 minutes to read

Lowest published from-price
$47,500
6 m studio, Smart Housing Solutions
Trade Me's stated range
Under $5,000 to over $260,000
kitsets to custom builds
Costs outside the home
4 categories
site, power, plumbing, consent
Prices last checked
15 September 2026
at the builder's own page

There is no such thing as an average tiny home price in New Zealand, and any site that gives you one has made it up. What does exist is a small number of builders who publish their prices in full, and what they publish is checkable. That is what this page is: their numbers, quoted, with the date we read them and a link so you can check we read them right.

What do NZ builders publish as their from-prices?

Smart Housing Solutions: published price list, read 15 September 2026
HomePublished price
6 m studiofrom $47,500
8 m one-bedroomfrom $57,500
10 m one-bedroomfrom $72,450
12 m one or two bedroomfrom $92,000
14 m two or three bedroomfrom $139,725
16 m three or four bedroomfrom $171,350

Their page also lists a Passive range "starting from $90,563 for a 10m one-bedroom". Their page lists these as starting prices and does not state whether GST is included. Source: Smart Housing Solutions, read 15 September 2026. Is this your business? Update or remove it.

HouseMe: prices from their own article, read 15 September 2026
HomePublished price
Studio (article, June 2024)starting at $49,500 incl. GST
One bedroom (article, June 2024)priced from $65,000 including GST
Two bedroom (article, June 2024)starting at $85,000 incl. GST

Their buy page marks prices "Inc. GST Exc. delivery" but did not render the figures when we read it, so the prices above are the ones in their own June 2024 article and may have changed. Their buy page lists models from a 15.1 m² studio to a 52.8 m² three bedroom and states that a Code Compliance Certificate is included. Sources: HouseMe buy page and their pricing article, both read 15 September 2026. Is this your business? Update or remove it.

For the wider market, Trade Me's own buyer article says tiny home prices in New Zealand "range from under $5,000 to over $260,000". That spread is real: the bottom is bare kitsets and the top is finished custom builds, and they are not the same product.

What is not included in the price of the home?

This is where budgets break. The quoted price is for the home. Getting it onto a site and connected is a separate project, and it is the one nobody quotes you at the start. Smart Housing Solutions is unusual in publishing its own not-included list with ranges, which is why we can quote it.

Costs outside the price of the home, as published by Smart Housing Solutions
CostTheir published range
Site preparation — levelling, gravel pad or concrete piles$1,500–8,000 typically
Power connection from your house or street$1,500–4,000
Plumbing / drainage connection$1,500–6,000 depending on access
Council consent fees if requiredtypically $1,500–5,000
Upgrades, including a heat pumparound $2,500 installed
Delivery surcharge for a build larger than 8×3quoted upfront

One builder's ranges on one date, not a national figure. Source: Smart Housing Solutions, read 15 September 2026.

What do council fees actually cost?

We do not publish a figure for this, because there isn't a national one and we have not been able to verify the numbers that circulate. Council fees are set by each council and depend on which consents you need and the value of the work. The only reliable answer is your council's current fees schedule for the consents your project actually needs.

What we can tell you is what MBIE says about the principle: councils "charge a fee for these services. The fee depends on the council and the amount of work involved, but is generally set for the recovery of reasonable costs. It will be a small proportion of the cost of the whole building project and will provide assurance that the job has been done properly."

Substantially, and in both directions. A building that fits a Schedule 1 exemption avoids the building consent process, but it also cannot have a bathroom or store potable water, which changes what you are buying. A granny flat under Schedule 1A avoids the consent but requires a Licensed Building Practitioner for the restricted building work. A home on wheels avoids the whole building consent question only while it stays genuinely movable and is not occupied long-term — and connecting it to services needs a consent regardless.

Work out which path you are on before you compare prices, because the cheapest home on the list may not be legal on your site. Check your consent path takes about a minute.

How to build your own budget

Building a realistic all-in number

  1. Start with a builder's published price for the size you actually need

    Use their number, not an average. Note whether it includes GST and whether it includes delivery.

  2. Add delivery to your address

    Ask for it in writing for your address, including any over-dimension requirements.

  3. Add site preparation

    Levelling, a pad or piles. This is quoted per site and depends on slope and access.

  4. Add services

    Power, water and wastewater. If the connection is to on-site utility services, MBIE says that work needs a building consent.

  5. Add council fees for the consents you actually need

    From your council's current fees schedule, for the consents your consent path requires.

  6. Add a contingency you would be comfortable spending

    Site work is where surprises live, because nobody knows what is under the ground until they dig.

Frequently asked questions

How much is a tiny home in NZ?

The lowest published from-price we have verified is $47,500 for a 6 m studio from Smart Housing Solutions, read 15 September 2026. Trade Me's buyer article puts the market range at under $5,000 to over $260,000. Both are the price of the home only.

Do those prices include GST?

It varies and you have to check. HouseMe marks its prices "Inc. GST Exc. delivery". Smart Housing Solutions' price page lists starting prices without stating whether GST is included.

What is not included in the price?

Typically site preparation, delivery, power, plumbing and drainage connections, and council fees. Smart Housing Solutions publishes ranges of $1,500–8,000, $1,500–4,000, $1,500–6,000 and $1,500–5,000 for those four.

How much are council consent fees?

There is no national figure. Councils set their own fees, and MBIE says they are generally set to recover reasonable costs and depend on the amount of work involved. Ask your council for their current schedule.

Why don't you publish an average price?

Because we would have to make it up. We have verified two builders' published price lists. Two price lists is not an average, and calling it one would be dishonest.

Is a tiny home cheaper than a granny flat?

They are often the same building under a different rule. What changes the cost is the consent path, the services and the site work, more than the label on the product.

Start here

Not sure where you stand? Answer six questions.

The checker tells you which rule your build falls under and links you straight to it. Free, and it doesn't ask for your email.